A 338 Km dual carriageway
connecting Warri town in
Delta State to Oron Town In
Akwa-Ibom State, Nigeria
The East-West road project Consists
of the construction of a second
carriageway and the rehabilitation of
the existing carriageway.
The total length of each carriageway
of the road is 188 Km, with 29 river
bridges of variable lengths ranging
from 31m to 260m, and 2 box girder
bridges with lengths of 700m and
850m.
It is one of the largest infrastructure
projects in Nigeria as it is a very
strategic road connecting the
country’s 2 busiest and foremost
commercial cities, Port Harcout and
Worri.
Setraco mobilized vast technological,
mechanical and human resources to
site for this project to complete it in
full speed by 2014.